National Specialized and Sophisticated “Little Giant” and 124 Intellectual Property Rights
Qualifications are not plaques on a wall; they are the stack of documents that can be opened during an on-site audit: system certificates, test reports, patent certificates, and batch records. This page consolidates the publicly available information.

Qualification Enterprise Qualifications
National Key Specialized and Sophisticated “Little Giant” Enterprise— Recognition of a manufacturing enterprise focused on a niche segment and mastering key processes, with emphasis on the position and technological content of its main products in the industrial chain.
National High-Tech Enterprise— R&D investment, intellectual property, and commercialization must all meet the standards for recognition, with a review every three years.
Guangdong Manufacturing Champion— Provincial recognition based on market share and technological level in niche product markets.
Guangdong Province Engineering Technology Research Center— A provincial R&D platform built on the enterprise, undertaking engineering validation of materials and processes.
Certificate numbers and validity periods are subject to the originals and can be verified on site during audits; numbers unsuitable for public disclosure are not shown on the page.
System Management Systems and Test Reports
Patents Intellectual Property: Representative Patents
Verify How to Verify
Three paths: ① Directly inspect the originals—when conducting a factory audit, we provide the original certificates and paper copies of the test reports; ② Review batch records—any batch of goods can be traced back to the raw-material batch number, process parameters, and inspection records; ③ Check the third-party platform—management-system certifications can be verified on the certification body's official website using the certificate number.
We also welcome customers bringing third-party auditors to the factory. The cleanroom, testing laboratory, and sample-retention area can all be opened for inspection (advance booking by 3 working days required).
Customer requirements
Leave your contact details and requirements so we can get in touch.